More Slab Prep

Concrete form.

Not much to mention today. While I was at work the concrete guys came to do the final prep work before they pour our slab. They used a skid steer to get all the tons of gravel in the basement and then leveled it, leaving two long courses empty so more concrete will be there for strength under the load-bearing walls. Our master bedroom will be built out on concrete piers so they dug out a pair of two foot wide holes and built forms to hold the concrete. Once the gravel is nice and level the rebar is laid and tied together.

East side slab prep.

West side slab prep.

Here’s a nice rainbow picture taken from our front yard a day or two later. Enjoy!

Rainbow.

Next time we will be finally be pouring our slab!!!